Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

313

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0714 #03 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $5,362 $13,800
MA0714 #02 Y:2013 Install / repair insulation on steam lines $9,831 $5,568
MA0714 #01 Y:2013 Burn a less expensive grade of fuel $64,988 $67,000
MA0702 #04 Y:2012 Utilize higher efficiency lamps and/or ballasts $868 $3,000
MA0702 #03 Y:2012 Install / repair insulation on steam lines $1,102 $2,210
MA0702 #02 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $2,144 $1,500
MA0702 #01 Y:2012 Reduce fluid flow rates $11,375 $9,400
MA0699 #06 Y:2012 Reduce the pressure of compressed air to the minimum required $706 $100
MA0699 #05 Y:2012 Use heat pump for space conditioning $1,250 $6,500
MA0699 #04 Y:2012 Eliminate/reduce an operation $1,855 $500
MA0699 #03 Y:2012 Shut off cooling if cold outside air will cool process $5,019 $24,000
MA0699 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $19,627 $104,325
MA0699 #01 Y:2012 Install timers and/or thermostats $25,140 $9,900
MA0696 #09 Y:2012 Insulate bare equipment $622 $1,100
MA0696 #08 Y:2012 Install occupancy sensors $1,705 $4,080
MA0696 #07 Y:2012 Reduce the pressure of compressed air to the minimum required $1,810 $200
MA0696 #06 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $2,462 $6,035
MA0696 #05 Y:2012 Utilize higher efficiency lamps and/or ballasts $3,048 $6,600
MA0696 #04 Y:2012 Preheat combustion air with waste heat $3,539 $17,500
MA0696 #03 Y:2012 Use optimum temperature $6,647 $4,000