313
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0714 #03 Y:2013 | 03 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $5,362 | $13,800 | |
| MA0714 #02 Y:2013 | 02 | 2013 | Install / repair insulation on steam lines | $9,831 | $5,568 | |
| MA0714 #01 Y:2013 | 01 | 2013 | Burn a less expensive grade of fuel | $64,988 | $67,000 | |
| MA0702 #04 Y:2012 | 04 | 2012 | Utilize higher efficiency lamps and/or ballasts | $868 | $3,000 | |
| MA0702 #03 Y:2012 | 03 | 2012 | Install / repair insulation on steam lines | $1,102 | $2,210 | |
| MA0702 #02 Y:2012 | 02 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,144 | $1,500 | |
| MA0702 #01 Y:2012 | 01 | 2012 | Reduce fluid flow rates | $11,375 | $9,400 | |
| MA0699 #06 Y:2012 | 06 | 2012 | Reduce the pressure of compressed air to the minimum required | $706 | $100 | |
| MA0699 #05 Y:2012 | 05 | 2012 | Use heat pump for space conditioning | $1,250 | $6,500 | |
| MA0699 #04 Y:2012 | 04 | 2012 | Eliminate/reduce an operation | $1,855 | $500 | |
| MA0699 #03 Y:2012 | 03 | 2012 | Shut off cooling if cold outside air will cool process | $5,019 | $24,000 | |
| MA0699 #02 Y:2012 | 02 | 2012 | Utilize higher efficiency lamps and/or ballasts | $19,627 | $104,325 | |
| MA0699 #01 Y:2012 | 01 | 2012 | Install timers and/or thermostats | $25,140 | $9,900 | |
| MA0696 #09 Y:2012 | 09 | 2012 | Insulate bare equipment | $622 | $1,100 | |
| MA0696 #08 Y:2012 | 08 | 2012 | Install occupancy sensors | $1,705 | $4,080 | |
| MA0696 #07 Y:2012 | 07 | 2012 | Reduce the pressure of compressed air to the minimum required | $1,810 | $200 | |
| MA0696 #06 Y:2012 | 06 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $2,462 | $6,035 | |
| MA0696 #05 Y:2012 | 05 | 2012 | Utilize higher efficiency lamps and/or ballasts | $3,048 | $6,600 | |
| MA0696 #04 Y:2012 | 04 | 2012 | Preheat combustion air with waste heat | $3,539 | $17,500 | |
| MA0696 #03 Y:2012 | 03 | 2012 | Use optimum temperature | $6,647 | $4,000 |