Assessment Year | 2012 |
---|---|
Principal Product | Tantalum capacitors |
NAICS | 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3675: Electronic Capacitors |
Sales Range | $10 M to 50M |
# of Employees | 158 |
Plant Area |
64,000
ft2
|
Annual Production | 760,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Vermont |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $214,442 | 2,993,941 |
kWh
|
$0.072 |
Electricity Demand | $131,780 | 7,557 |
kW-mo/yr
|
$17.44 |
Fuel Oil #2 | $64,172 | 2,455 |
MMBtu
|
$26.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,597 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $51,742 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $25,140 | $9,900 |
$13,272
184,334
kWh
|
- |
$11,868
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,627 | $104,325 |
$13,559
188,320
kWh
|
$6,068
-
kW-mo/yr
|
- | |
03 | 2.2691: Shut off cooling if cold outside air will cool process | $5,019 | $24,000 |
$5,019
69,709
kWh
|
- | - | |
04 | 3.1161: Eliminate/reduce an operation | $1,855 | $500 |
$1,855
25,776
kWh
|
- | - | |
05 | 2.7234: Use heat pump for space conditioning | $1,250 | $6,500 |
$1,250
17,365
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $706 | $100 |
$706
9,811
kWh
|
- | - | |
TOTAL RECOMMENDED | $53,597 | $145,325 |
$35,661
495,315
kWh
|
$6,068
-
kW-mo/yr
|
$11,868
-
MMBtu
|
||
TOTAL IMPLEMENTED | $51,742 | $144,825 |
$33,806
469,539
kWh
|
$6,068
-
kW-mo/yr
|
$11,868
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs