ITAC Assessment: MA0699
ITAC logo
ITAC Assessment: MA0699
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Tantalum capacitors
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3675: Electronic Capacitors
Sales Range $10
M
to 50
M
# of Employees 158
Plant Area 64,000
ft2
Annual Production 760,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,442 2,993,941
kWh
Electricity Demand $131,780 7,557
kW-mo/yr
Fuel Oil #2 $64,172 2,455
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,597 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,742

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.7261: Install timers and/or thermostats $25,140 $9,900 $13,272
184,334
kWh
- $11,868
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $19,627 $104,325 $13,559
188,320
kWh
$6,068
-
kW-mo/yr
-
03 2.2691: Shut off cooling if cold outside air will cool process $5,019 $24,000 $5,019
69,709
kWh
- -
04 3.1161: Eliminate/reduce an operation $1,855 $500 $1,855
25,776
kWh
- -
05 2.7234: Use heat pump for space conditioning $1,250 $6,500 $1,250
17,365
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $706 $100 $706
9,811
kWh
- -
TOTAL RECOMMENDED $53,597 $145,325 $35,661
495,315
kWh
$6,068
-
kW-mo/yr
$11,868
-
MMBtu
TOTAL IMPLEMENTED $51,742 $144,825 $33,806
469,539
kWh
$6,068
-
kW-mo/yr
$11,868
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs