ITAC Assessment: SF0376
ITAC logo
ITAC Assessment: SF0376
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product fruit packaging
NAICS 115114: Postharvest Crop Activities (except Cotton Ginning)
SIC 723: Beauty Shops
Sales Range $50
M
to 100
M
# of Employees 1,500
Plant Area 91,734
ft2
Annual Production 100,000
units
Production Hrs. Annual 5,580
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,791 898,522
kWh
Electricity Demand $9,064 2,501
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,577

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $397 $535 $353
2,301
kWh
$44
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $34,155 $110,307 $32,094
209,288
kWh
$2,061
-
kW-mo/yr
03 2.7135: Install occupancy sensors $2,011 $6,725 $1,912
12,461
kWh
$99
-
kW-mo/yr
04 2.2626: Avoid frost formation on evaporators $2,865 $9,600 $2,865
18,684
kWh
-
05 2.2621: Modify refrigeration system to operate at a lower pressure $17,149 $75,000 $16,173
105,462
kWh
$976
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,348 $20,943 $3,339
21,772
kWh
$1,009
-
kW-mo/yr
TOTAL RECOMMENDED $60,925 $223,110 $56,736
369,968
kWh
$4,189
-
kW-mo/yr
TOTAL IMPLEMENTED $56,577 $202,167 $53,397
348,196
kWh
$3,180
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs