Assessment Year | 2012 |
---|---|
Principal Product | Talc powder |
NAICS | 212393: Other Chemical and Fertilizer Mineral Mining |
SIC | 3295: Minerals and Earths, Ground or Otherwise Treated |
Sales Range | $1 M to 5M |
# of Employees | 26 |
Plant Area |
80,000
ft2
|
Annual Production | 80,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Vermont |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $397,465 | 4,724,400 |
kWh
|
$0.084 |
Electricity Demand | $269,084 | 19,284 |
kW-mo/yr
|
$13.95 |
Electricity Fees | $6,722 | - |
|
- |
LPG | $35,920 | 1,513 |
MMBtu
|
$23.74 |
Fuel Oil #2 | $174,807 | 7,312 |
MMBtu
|
$23.91 |
Other Energy | $4,674 | 166 |
MMBtu
|
$28.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,007 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,737 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4323: Use optimum size and capacity equipment | $19,393 | $39,000 |
$4,393
52,241
kWh
|
- | $15,000 | |
02 | 2.2135: Repair and eliminate steam leaks | $15,781 | $2,800 |
$15,781
187,649
kWh
|
- | - | |
03 | 2.2211: Use optimum temperature | $6,647 | $4,000 | - |
$6,647
-
MMBtu
|
- | |
04 | 2.2442: Preheat combustion air with waste heat | $3,539 | $17,500 | - |
$3,539
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,048 | $6,600 |
$3,048
36,242
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,462 | $6,035 |
$2,462
29,283
kWh
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,810 | $200 |
$1,810
21,528
kWh
|
- | - | |
08 | 2.7135: Install occupancy sensors | $1,705 | $4,080 |
$1,705
20,274
kWh
|
- | - | |
09 | 2.2511: Insulate bare equipment | $622 | $1,100 | - |
$622
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $55,007 | $81,315 |
$29,199
347,217
kWh
|
$10,808
-
MMBtu
|
$15,000 | ||
TOTAL IMPLEMENTED | $41,737 | $52,680 |
$26,737
317,934
kWh
|
- | $15,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs