ITAC Assessment: MA0696
ITAC logo
ITAC Assessment: MA0696
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Talc powder
NAICS 212393: Other Chemical and Fertilizer Mineral Mining
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $1
M
to 5
M
# of Employees 26
Plant Area 80,000
ft2
Annual Production 80,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $397,465 4,724,400
kWh
Electricity Demand $269,084 19,284
kW-mo/yr
Electricity Fees $6,722 -
LPG $35,920 1,513
MMBtu
Fuel Oil #2 $174,807 7,312
MMBtu
Other Energy $4,674 166
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,007 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,737

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Ancillary Material Cost Savings
01 2.4323: Use optimum size and capacity equipment $19,393 $39,000 $4,393
52,241
kWh
- $15,000
02 2.2135: Repair and eliminate steam leaks $15,781 $2,800 $15,781
187,649
kWh
- -
03 2.2211: Use optimum temperature $6,647 $4,000 - $6,647
-
MMBtu
-
04 2.2442: Preheat combustion air with waste heat $3,539 $17,500 - $3,539
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,048 $6,600 $3,048
36,242
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,462 $6,035 $2,462
29,283
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,810 $200 $1,810
21,528
kWh
- -
08 2.7135: Install occupancy sensors $1,705 $4,080 $1,705
20,274
kWh
- -
09 2.2511: Insulate bare equipment $622 $1,100 - $622
-
MMBtu
-
TOTAL RECOMMENDED $55,007 $81,315 $29,199
347,217
kWh
$10,808
-
MMBtu
$15,000
TOTAL IMPLEMENTED $41,737 $52,680 $26,737
317,934
kWh
- $15,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs