Assessment Year | 1997 |
---|---|
Principal Product | Tortillas & Tortilla Chips |
NAICS |
n/a
|
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 50 |
Plant Area |
12,000
ft2
|
Annual Production | 25,000,000
lb
|
Production Hrs. Annual | 3,744
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $26,058 | 321,219 |
kWh
|
$0.081 |
Electricity Demand | $6,334 | 1,525 |
kW-mo/yr
|
$4.15 |
Natural Gas | $35,552 | 9,948 |
MMBtu
|
$3.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,185 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,063 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $219 | $376 |
$184
2,345
kWh
|
$35
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,448 | $7,560 |
$2,084
25,791
kWh
|
$364
-
kW-mo/yr
|
- | - | - | |
03 | 2.2122: Install / repair insulation on condensate lines | $196 | $811 |
$196
16,120
kWh
|
- | - | - | - | |
04 | 3.4151: Minimize water usage | $1,544 | $60 | - | - |
$1,544
-
Tgal
|
- | - | |
05 | 3.4115: Recover and reuse cooling water | $1,214 | $765 |
$(-262.0)
(-3,224)
kWh
|
- |
$1,476
-
Tgal
|
- | - | |
06 | 3.2111: Install redundant equipment to avoid losses caused by equipment failure and routine maintenance | $9,844 | $900 |
$(-78.0)
(-879)
kWh
|
- | - |
$9,922
-
lb
|
- | |
07 | 3.2176: Increase use of automation | $43,680 | $47,000 | - | - | - | - | $43,680 | |
08 | 3.2176: Increase use of automation | $13,000 | $6,000 | - | - | - | - | $13,000 | |
09 | 4.423: Move product using mechanical means | $1,040 | $1,000 | - | - | - | - | $1,040 | |
TOTAL RECOMMENDED | $73,185 | $64,472 |
$2,124
40,153
kWh
|
$399
-
kW-mo/yr
|
$3,020
-
Tgal
|
$9,922
-
lb
|
$57,720 | ||
TOTAL IMPLEMENTED | $10,063 | $1,276 |
$106
1,466
kWh
|
$35
-
kW-mo/yr
|
- |
$9,922
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs