ITAC Assessment: MA0714
ITAC logo
ITAC Assessment: MA0714
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Mica insullation products
NAICS 327999: All Other Miscellaneous Nonmetallic Mineral Product Manufacturing
SIC 3299: Nonmetallic Mineral Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 60,000
ft2
Annual Production 1,160,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $249,791 3,617,378
kWh
Electricity Demand $66,313 6,936
kW-mo/yr
Electricity Fees $70,200 -
LPG $248,233 18,205
MMBtu
Fuel Oil #6 $299,105 17,164
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,189 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $92,729

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #6 Savings
01 2.1331: Burn a less expensive grade of fuel $64,988 $67,000 - - $(-234,117.0)
-
MMBtu
$299,105
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $9,831 $5,568 - - - $9,831
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,362 $13,800 $5,362
77,834
kWh
- - -
04 2.2511: Insulate bare equipment $4,919 $12,300 $4,919
71,393
kWh
- - -
05 2.2511: Insulate bare equipment $4,187 $7,500 - - $4,187
-
MMBtu
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,354 $9,300 $149
2,160
kWh
- $3,205
-
MMBtu
-
07 2.3212: Optimize plant power factor $11,188 $13,500 - $11,188
-
kW-mo/yr
- -
08 2.6213: Turn off steam / hot water lines leading to space heating units $1,360 $150 - - - $1,360
-
MMBtu
TOTAL RECOMMENDED $105,189 $129,118 $10,430
151,387
kWh
$11,188
-
kW-mo/yr
$(-226,725.0)
-
MMBtu
$310,296
-
MMBtu
TOTAL IMPLEMENTED $92,729 $100,018 $5,362
77,834
kWh
$11,188
-
kW-mo/yr
$(-234,117.0)
-
MMBtu
$310,296
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs