Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,678

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0589 #11 Y:2025 Install vinyl strip / high speed / air curtain doors $1,046 $3,573
SU0589 #10 Y:2025 Install an uninteruptable power supply $160,000 $480,000
SU0589 #08 Y:2025 Conserve energy by efficient use of vending machines $1,631 $1,642
SU0589 #04 Y:2025 Use or replace with energy efficient substitutes $3,325 $313
SU0589 #03 Y:2025 Eliminate or reduce compressed air usage $37,179 -
SU0589 #01 Y:2025 Reschedule plant operations or reduce load to avoid peaks $18,704 -
SU0587 #11 Y:2025 Recover waste heat from equipment $151 $1,949
SU0587 #10 Y:2025 Install vinyl strip / high speed / air curtain doors $42 $204
SU0587 #09 Y:2025 Conserve energy by efficient use of vending machines $210 $736
SU0587 #08 Y:2025 Install occupancy sensors $1,014 $1,835
SU0587 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,104 $330
SU0587 #06 Y:2025 Reduce space conditioning during non-working hours $2,279 $725
SU0587 #05 Y:2025 Improve air circulation with destratification fans / other methods $7,394 $944
SU0587 #04 Y:2025 Eliminate or reduce compressed air usage $433 -
SU0587 #03 Y:2025 Reschedule plant operations or reduce load to avoid peaks $2,497 -
SU0579 #11 Y:2025 Use heat pump for space conditioning $2,615 $31,920
SU0579 #10 Y:2025 Install occupancy sensors $107 $598
SU0579 #08 Y:2025 Conserve energy by efficient use of vending machines $80 $188
SU0579 #04 Y:2025 Reschedule plant operations or reduce load to avoid peaks $2,944 -
SU0578 #18 Y:2025 Use cooling tower or economizer to replace chiller cooling $4,025 $15,784