ITAC Assessment: SU0560
ITAC logo
ITAC Assessment: SU0560
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Power Generation Support Products
NAICS 332710: Machine Shops
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $10
M
to 50
M
# of Employees 101
Plant Area 27,944
ft2
Annual Production 25,000
units
Production Hrs. Annual 4,420
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,336 648,600
kWh
Electricity Demand $32,018 2,543
kW-mo/yr
Electricity Fees $7,472 -
Natural Gas $2,240 740
MMBtu
Other Gas $893 1
MMBtu
Waste Disposal Costs
Water Usage $13,422 10
Tgal
TOTAL YEARLY COSTS $123,380
RECOMMENDED SAVINGS* $14,677 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7122: Disconnect ballasts $1,546 - $1,073
10,316
kWh
$473
-
kW-mo/yr
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,601 - - $1,601
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $815 - $815
7,835
kWh
- - -
04 4.821: Pay bills on time to avoid late fees $797 - - - - $797
05 2.7224: Reduce space conditioning during non-working hours $363 - - - $363
-
MMBtu
-
06 2.4322: Use or replace with energy efficient substitutes $6,129 $250 $3,978
38,250
kWh
$2,645
-
kW-mo/yr
$(-493.8)
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,646 $170 $1,646
15,828
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $1,462 $432 $1,462
14,056
kWh
- - -
09 2.6211: Conserve energy by efficient use of vending machines $319 $383 $319
3,066
kWh
- - -
TOTAL RECOMMENDED $14,677 $1,235 $9,293
89,352
kWh
$4,718
-
kW-mo/yr
$(-130.7)
-
MMBtu
$797
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs