ITAC Assessment: TR0013
ITAC logo
ITAC Assessment: TR0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Treated Waste Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area 6,522
ft2
Annual Production 2,500,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $531,437 7,039,200
kWh
Electricity Demand $67,233 18,420
kW-mo/yr
Electricity Fees $(-8,307.0) -
Waste Disposal Costs
Water Usage $1 2,500,000
Tgal
TOTAL YEARLY COSTS $590,364
RECOMMENDED SAVINGS* $23,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,635

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $1,099 $216 $1,099
14,653
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,439 - $10,879
249
kWh
$560
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,097 $7,743 $9,787
130,489
kWh
$1,310
-
kW-mo/yr
TOTAL RECOMMENDED $23,635 $7,959 $21,765
145,391
kWh
$1,870
-
kW-mo/yr
TOTAL IMPLEMENTED $23,635 $7,959 $21,765
145,391
kWh
$1,870
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs