ITAC Assessment: AM0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product metal building components
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 60,800
ft2
Annual Production 3,600
thousand feet
Production Hrs. Annual 2,016
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,687 433,470
kWh
Electricity Demand $11,387 1,468
kW-mo/yr
Natural Gas $3,958 736
MMBtu
LPG $810 7
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 4.454: Modify startup/shutdown times $17,100 - - - $17,100 -
02 2.7111: Reduce illumination to minimum necessary levels $1,300 $120 $1,300
48,945
kWh
- - -
03 2.7124: Make a practice of turning off lights when not needed $450 - $450
17,292
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $290 $370 $60
2,345
kWh
$40
-
kW-mo/yr
$190 -
05 2.8123: Pay utility bills on time $100 - - - - $100
TOTAL RECOMMENDED $19,240 $490 $1,810
68,582
kWh
$40
-
kW-mo/yr
$17,290 $100
TOTAL IMPLEMENTED $1,400 $120 $1,300
48,945
kWh
- - $100
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs