Assessment Year | 2007 |
---|---|
Principal Product | Carbide Pre-Form Cutting Tools |
NAICS | 333517: Machine Tool Manufacturing |
SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
Sales Range | $10 M to 50M |
# of Employees | 108 |
Plant Area |
37,855
ft2
|
Annual Production | 50,500
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $185,295 | 3,529,691 |
kWh
|
$0.052 |
Electricity Demand | $93,899 | 8,830 |
kW-mo/yr
|
$10.63 |
Electricity Fees | $3,032 | - |
|
- |
Natural Gas | $20,488 | 16,103 |
MMBtu
|
$1.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,569 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,752 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Gaseous Waste Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.5311: Recover and reuse waste material | $37,752 | $38,000 | - | - | - |
$37,752
-
lb
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,146 | $12,000 |
$2,252
42,901
kWh
|
$894
-
kW-mo/yr
|
- | - | |
03 | 2.2425: Use flue gases to heat process or service water | $2,277 | $4,600 | - | - |
$2,277
-
MMBtu
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $788 | $500 |
$565
10,763
kWh
|
$223
-
kW-mo/yr
|
- | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $606 | - |
$434
8,262
kWh
|
$172
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $44,569 | $55,100 |
$3,251
61,926
kWh
|
$1,289
-
kW-mo/yr
|
$2,277
-
MMBtu
|
$37,752
-
lb
|
||
TOTAL IMPLEMENTED | $3,752 | $12,000 |
$2,686
51,163
kWh
|
$1,066
-
kW-mo/yr
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs