ITAC Assessment: UM0331
ITAC logo
ITAC Assessment: UM0331
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Carbide Pre-Form Cutting Tools
NAICS 333517: Machine Tool Manufacturing
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 37,855
ft2
Annual Production 50,500
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,295 3,529,691
kWh
Electricity Demand $93,899 8,830
kW-mo/yr
Electricity Fees $3,032 -
Natural Gas $20,488 16,103
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,569 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,752

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Gaseous Waste Savings
01 3.5311: Recover and reuse waste material $37,752 $38,000 - - - $37,752
-
lb
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,146 $12,000 $2,252
42,901
kWh
$894
-
kW-mo/yr
- -
03 2.2425: Use flue gases to heat process or service water $2,277 $4,600 - - $2,277
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $788 $500 $565
10,763
kWh
$223
-
kW-mo/yr
- -
05 2.7111: Reduce illumination to minimum necessary levels $606 - $434
8,262
kWh
$172
-
kW-mo/yr
- -
TOTAL RECOMMENDED $44,569 $55,100 $3,251
61,926
kWh
$1,289
-
kW-mo/yr
$2,277
-
MMBtu
$37,752
-
lb
TOTAL IMPLEMENTED $3,752 $12,000 $2,686
51,163
kWh
$1,066
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs