ITAC Assessment: SU0561
ITAC logo
ITAC Assessment: SU0561
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Beer, malt beverages, and other beverages
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 137
Plant Area 350,000
ft2
Annual Production 335,623
bbl
Production Hrs. Annual 2,340
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,226 3,579,627
kWh
Electricity Demand $132,870 10,699
kW-mo/yr
Electricity Fees $3,431 -
Natural Gas $383,175 89,974
MMBtu
LPG $14,574 414
MMBtu
Other Gas $7,757 1
MMBtu
Waste Disposal Costs
Water Usage $318,231 92,451
Tgal
Water Disposal $1 801,701
Tgal
Solid Waste (non-haz) $1 26,432
lb
TOTAL YEARLY COSTS $982,265
RECOMMENDED SAVINGS* $59,676 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 4.821: Pay bills on time to avoid late fees $295 - - - - - - $295
02 2.8121: Apply for tax-free status for energy purchases $4,133 $25 - - - - - $4,133
03 2.2437: Recover waste heat from equipment $2,051 $390 $1,384
40,705
kWh
- $667
-
MMBtu
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $326 $95 $326
9,600
kWh
- - - - -
05 2.2136: Install / repair insulation on steam lines $4,166 $2,943 - - $4,166
-
MMBtu
- - -
06 2.4221: Install compressor air intakes in coolest locations $1,218 $995 $1,218
35,821
kWh
- - - - -
07 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,101 $1,100 $1,101
32,395
kWh
- - - - -
08 2.4322: Use or replace with energy efficient substitutes $704 $1,196 $225
6,630
kWh
$113
-
kW-mo/yr
- - $88 $278
09 2.8227: Adjust / maintain fork lift trucks for most efficient operation $13,655 $30,000 $(-918.3)
(-24,820)
kWh
- - $14,574
-
MMBtu
- -
10 2.6211: Conserve energy by efficient use of vending machines $170 $556 $170
4,599
kWh
- - - - -
11 2.9114: Use solar heat to make electricty $31,857 $400,736 $31,857
860,994
kWh
- - - - -
TOTAL RECOMMENDED $59,676 $438,036 $35,364
965,923
kWh
$113
-
kW-mo/yr
$4,832
-
MMBtu
$14,574
-
MMBtu
$88 $4,706
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs