| Assessment Year | 2024 | 
|---|---|
| Principal Product | Beer, malt beverages, and other beverages | 
| NAICS | 312120: Breweries | 
| SIC | 2082: Malt Beverages | 
| Sales Range | $10 Mto 50 M | 
| # of Employees | 137 | 
| Plant Area | 350,000 
ft2
 | 
| Annual Production | 335,623 
bbl
 | 
| Production Hrs. Annual | 2,340 
hrs
 | 
| Location (State) | New York | 
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $122,226 | 3,579,627 | 
kWh
 | $0.034 | |
| Electricity Demand | $132,870 | 10,699 | 
kW-mo/yr
 | $12.42 | |
| Electricity Fees | $3,431 | - |  | - | |
| Natural Gas | $383,175 | 89,974 | 
MMBtu
 | $4.26 | |
| LPG | $14,574 | 414 | 
MMBtu
 | $35.21 | |
| Other Gas | $7,757 | 1 | 
MMBtu
 | $7,756.77 | |
| Waste Disposal Costs | |||||
| Water Usage | $318,231 | 92,451 | 
Tgal
 | $3.44 | |
| Water Disposal | $1 | 801,701 | 
Tgal
 | $0.000 | |
| Solid Waste (non-haz) | $1 | 26,432 | 
lb
 | $0.000 | |
| TOTAL YEARLY COSTS | $982,265 | ||||
| RECOMMENDED SAVINGS* | $59,676 | See individual recommendations below*Non-energy impacts included in savings. | |||
| IMPLEMENTED SAVINGS* | $6,729 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings | 
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.821: Pay bills on time to avoid late fees | $295 | - | - | - | - | - | - | $295 | |
| 02 | 2.8121: Apply for tax-free status for energy purchases | $4,133 | $25 | - | - | - | - | - | $4,133 | |
| 03 | 2.2437: Recover waste heat from equipment | $2,051 | $390 | $1,384 40,705
                                 
kWh
 | - | $667 -
                                 
MMBtu
 | - | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $326 | $95 | $326 9,600
                                 
kWh
 | - | - | - | - | - | |
| 05 | 2.2136: Install / repair insulation on steam lines | $4,166 | $2,943 | - | - | $4,166 -
                                 
MMBtu
 | - | - | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,218 | $995 | $1,218 35,821
                                 
kWh
 | - | - | - | - | - | |
| 07 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $1,101 | $1,100 | $1,101 32,395
                                 
kWh
 | - | - | - | - | - | |
| 08 | 2.4322: Use or replace with energy efficient substitutes | $704 | $1,196 | $225 6,630
                                 
kWh
 | $113 -
                                 
kW-mo/yr
 | - | - | $88 | $278 | |
| 09 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $13,655 | $30,000 | $(-918.3) (-24,820)
                                 
kWh
 | - | - | $14,574 -
                                 
MMBtu
 | - | - | |
| 10 | 2.6211: Conserve energy by efficient use of vending machines | $170 | $556 | $170 4,599
                                 
kWh
 | - | - | - | - | - | |
| 11 | 2.9114: Use solar heat to make electricty | $31,857 | $400,736 | $31,857 860,994
                                 
kWh
 | - | - | - | - | - | |
| TOTAL RECOMMENDED | $59,676 | $438,036 | $35,364 965,923
                                 
kWh
 | $113 -
                                 
kW-mo/yr
 | $4,832 -
                                 
MMBtu
 | $14,574 -
                                 
MMBtu
 | $88 | $4,706 | ||
| TOTAL IMPLEMENTED | $6,729 | $2,972 | $1,823 53,223
                                 
kWh
 | $113 -
                                 
kW-mo/yr
 | - | - | $88 | $4,706 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs
             
             
             
            