ITAC Assessment: SU0565
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Metal Parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 85,000
ft2
Annual Production 182,500
lb
Production Hrs. Annual 4,264
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,443 2,967,097
kWh
Electricity Demand $127,054 7,544
kW-mo/yr
Electricity Fees $36,733 -
Natural Gas $5,049 754
MMBtu
LPG $872 4
MMBtu
Other Gas $663 1
MMBtu
TOTAL YEARLY COSTS $279,814
RECOMMENDED SAVINGS* $242,747 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,336 - - $6,336
-
kW-mo/yr
- -
02 2.8121: Apply for tax-free status for energy purchases $14,793 - - - - $14,793
03 2.4239: Eliminate or reduce compressed air usage $1,877 - $1,877
50,721
kWh
- - -
04 2.4322: Use or replace with energy efficient substitutes $965 $54 $354
9,563
kWh
$884
-
kW-mo/yr
$(-273.0)
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,849 $329 $1,849
49,965
kWh
- - -
06 4.631: Install an uninteruptable power supply $180,000 $160,000 - - - $180,000
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,157 $7,850 $2,012
54,383
kWh
$2,577
-
kW-mo/yr
- $567
08 2.4322: Use or replace with energy efficient substitutes $566 $906 $169
4,555
kWh
$105
-
kW-mo/yr
- $292
09 2.2437: Recover waste heat from equipment $1,298 $6,264 $1,298
35,076
kWh
- - -
10 2.9114: Use solar heat to make electricty $29,907 $383,075 $29,907
808,300
kWh
- - -
TOTAL RECOMMENDED $242,747 $558,479 $37,465
1,012,562
kWh
$9,903
-
kW-mo/yr
$(-273.0)
-
MMBtu
$195,652
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs