Assessment Year | 1995 |
---|---|
Principal Product | metal plating |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 50 |
Plant Area |
23,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,862
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $132,190 | 1,264,654 |
kWh
|
$0.10 |
Natural Gas | $80,623 | 13,090 |
MMBtu
|
$6.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $89,065 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,808 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1331: Burn a less expensive grade of fuel | $4,128 | $1,860 | - | - | - | - | $4,128 | |
02 | 2.2612: Use cooling tower water instead of refrigeration | $1,027 | $3,770 |
$1,027
11,723
kWh
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $653 | - |
$653
7,620
kWh
|
- | - | - | - | |
04 | 2.2511: Insulate bare equipment | $504 | $1,010 | - |
$504
-
MMBtu
|
- | - | - | |
05 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $57,939 | $118,450 | - | - | - |
$57,939
-
lb
|
- | |
06 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $23,990 | $500 | - | - |
$23,990
-
Tgal
|
- | - | |
07 | 3.1244: Reduce solution drag-out to prevent solution loss | $824 | $3,000 | - | - | - |
$824
-
lb
|
- | |
TOTAL RECOMMENDED | $89,065 | $128,590 |
$1,680
19,343
kWh
|
$504
-
MMBtu
|
$23,990
-
Tgal
|
$58,763
-
lb
|
$4,128 | ||
TOTAL IMPLEMENTED | $5,808 | $5,630 |
$1,680
19,343
kWh
|
- | - | - | $4,128 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs