| Assessment Year | 1995 |
|---|---|
| Principal Product | metal plating |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 50 |
| Plant Area |
23,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,862
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $132,190 | 1,264,654 |
kWh
|
$0.10 |
| Natural Gas | $80,623 | 13,090 |
MMBtu
|
$6.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $89,065 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,808 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1331: Burn a less expensive grade of fuel | $4,128 | $1,860 | - | - | - | - | $4,128 | |
| 02 | 2.2612: Use cooling tower water instead of refrigeration | $1,027 | $3,770 |
$1,027
11,723
kWh
|
- | - | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $653 | - |
$653
7,620
kWh
|
- | - | - | - | |
| 04 | 2.2511: Insulate bare equipment | $504 | $1,010 | - |
$504
-
MMBtu
|
- | - | - | |
| 05 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $57,939 | $118,450 | - | - | - |
$57,939
-
lb
|
- | |
| 06 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $23,990 | $500 | - | - |
$23,990
-
Tgal
|
- | - | |
| 07 | 3.1244: Reduce solution drag-out to prevent solution loss | $824 | $3,000 | - | - | - |
$824
-
lb
|
- | |
| TOTAL RECOMMENDED | $89,065 | $128,590 |
$1,680
19,343
kWh
|
$504
-
MMBtu
|
$23,990
-
Tgal
|
$58,763
-
lb
|
$4,128 | ||
| TOTAL IMPLEMENTED | $5,808 | $5,630 |
$1,680
19,343
kWh
|
- | - | - | $4,128 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs