ITAC Assessment: UM0160
ITAC logo
ITAC Assessment: UM0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Sealants and Adhesives
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $50
M
to 100
M
# of Employees 275
Plant Area 200,000
ft2
Annual Production 58,000,000
lb
Production Hrs. Annual 6,100
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $391,451 10,927,609
kWh
Electricity Demand $228,352 25,116
kW-mo/yr
Electricity Fees $16,765 -
Natural Gas $114,132 37,905
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,063 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,463

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,149 $200 $817
22,567
kWh
$332
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $582 $50 $413
11,430
kWh
$169
-
kW-mo/yr
- - -
03 2.3137: Use power during off-peak periods $55,632 $22,000 - $55,632
-
kW-mo/yr
- - -
04 2.7229: Air condition only space necessary $2,800 $220 - - $2,800
-
MMBtu
- -
05 3.5311: Recover and reuse waste material $7,300 $500 - - - $7,300
-
lb
-
06 4.611: Begin a practice of predictive / preventative maintenance $1,600 $300 - - - - $1,600
TOTAL RECOMMENDED $69,063 $23,270 $1,230
33,997
kWh
$56,133
-
kW-mo/yr
$2,800
-
MMBtu
$7,300
-
lb
$1,600
TOTAL IMPLEMENTED $67,463 $22,970 $1,230
33,997
kWh
$56,133
-
kW-mo/yr
$2,800
-
MMBtu
$7,300
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs