Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

181

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0561 #06 Y:2023 Utilize energy-efficient belts and other improved mechanisms $2,282 $458
AS0561 #05 Y:2023 Use photocell controls $3,488 $7,137
AS0561 #04 Y:2023 Use computer programs to optimize hvac performance $4,993 $5,854
AS0561 #03 Y:2023 Install vinyl strip / high speed / air curtain doors $5,616 $943
AS0561 #02 Y:2023 Upgrade controls on compressors $23,596 $10,513
AS0561 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $102,285 $40,427
AS0560 #06 Y:2023 Utilize energy-efficient belts and other improved mechanisms $112 $414
AS0560 #01 Y:2023 Change procedures / equipment / operating conditions $701,165 $7,692,249
AS0544 #05 Y:2023 Install occupancy sensors $874 $1,115
AS0544 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,591 $2,841
AS0544 #03 Y:2023 Use photocell controls $8,391 $6,033
AS0544 #02 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $13,200 $21,887
AS0544 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $22,226 $18,665
AS0543 #06 Y:2023 Install timers on light switches in little used areas $81 $222
AS0543 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $15,420 $76,246
AS0542 #04 Y:2023 Eliminate/reduce an operation $331 $50
AS0542 #02 Y:2023 Begin a practice of predictive / preventative maintenance $9,017 $19,689
AS0540 #05 Y:2022 Close holes and openings in building such as broken windows $237 $398
AS0540 #01 Y:2022 Use solar heat to make electricty $9,774 $97,049
AS0476 #04 Y:2019 Recover and reuse cooling water $14,698 $7,484