ITAC Assessment: AS0543
ITAC logo
ITAC Assessment: AS0543
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product treated wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 9
Plant Area 10,773
ft2
Annual Production 8,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,180 907,100
kWh
Electricity Demand $28,928 3,277
kW-mo/yr
TOTAL YEARLY COSTS $105,108
RECOMMENDED SAVINGS* $19,254 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,753

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,420 $76,246 $11,102
132,161
kWh
$4,318
-
kW-mo/yr
-
02 2.7229: Air condition only space necessary $1,804 $8,019 $1,874
22,312
kWh
$(-70.0)
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,306 $2,116 $779
9,283
kWh
$473
-
kW-mo/yr
$54
04 2.7221: Lower temperature during the winter season and vice-versa $493 $25 $280
3,329
kWh
$213
-
kW-mo/yr
-
05 2.7444: Close holes and openings in building such as broken windows $150 $92 $88
1,043
kWh
$62
-
kW-mo/yr
-
06 2.7132: Install timers on light switches in little used areas $81 $222 $81
966
kWh
- -
TOTAL RECOMMENDED $19,254 $86,720 $14,204
169,094
kWh
$4,996
-
kW-mo/yr
$54
TOTAL IMPLEMENTED $3,753 $10,252 $3,021
35,967
kWh
$678
-
kW-mo/yr
$54
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs