ITAC Assessment: AS0544
ITAC logo
ITAC Assessment: AS0544
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product treated wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 7
Plant Area 325,500
ft2
Annual Production 300,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,487 1,229,760
kWh
Electricity Demand $14,255 1,296
kW-mo/yr
Electricity Fees $18,064 -
TOTAL YEARLY COSTS $120,806
RECOMMENDED SAVINGS* $46,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,226 $18,665 $18,706
259,954
kWh
$3,520
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,200 $21,887 $10,164
141,250
kWh
$3,036
-
kW-mo/yr
-
03 2.7134: Use photocell controls $8,391 $6,033 $7,060
98,112
kWh
$1,331
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,591 $2,841 $1,172
16,293
kWh
$243
-
kW-mo/yr
$176
05 2.7135: Install occupancy sensors $874 $1,115 $724
10,054
kWh
$150
-
kW-mo/yr
-
TOTAL RECOMMENDED $46,282 $50,541 $37,826
525,663
kWh
$8,280
-
kW-mo/yr
$176
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs