Assessment Year | 2001 |
---|---|
Principal Product | Abrasive stones |
NAICS |
n/a
|
SIC | 3291: Abrasive Products |
Sales Range | $10 M to 50M |
# of Employees | 54 |
Plant Area |
90,000
ft2
|
Annual Production | 1,225,000
lb
|
Production Hrs. Annual | 8,450
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $195,791 | 3,618,000 |
kWh
|
$0.054 |
Electricity Demand | $80,079 | 9,076 |
kW-mo/yr
|
$8.82 |
Electricity Fees | $1,482 | - |
|
- |
Fuel Oil #4 | $59,137 | 9,360 |
MMBtu
|
$6.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $81,493 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $965 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #4 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $46,957 | $57,500 | n/a |
$78,325
1,442,442
kWh
|
$17,872
-
kW-mo/yr
|
$(-49,240.0)
-
MMBtu
|
- |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $5,668 | $14,000 | n/a | - | - | - |
$5,668
-
MMBtu
|
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $12,833 | $13,000 | n/a | - | - | - |
$12,833
-
MMBtu
|
04 | 2.3212: Optimize plant power factor | $12,423 | $7,500 |
$4,546
9,486
kWh
|
- | - |
$7,877
-
MMBtu
|
|
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,038 | $10,000 |
$2,790
51,383
kWh
|
- |
$(-1,752.0)
-
MMBtu
|
- | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $911 | $6,000 |
$2,447
45,068
kWh
|
- |
$(-1,536.0)
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $698 | $12,180 |
$531
9,772
kWh
|
$167
-
kW-mo/yr
|
- | - | |
08 | 2.7135: Install occupancy sensors | $508 | $300 |
$508
9,353
kWh
|
- | - | - | |
09 | 2.2511: Insulate bare equipment | $457 | $500 | - | - | - |
$457
-
MMBtu
|
|
TOTAL RECOMMENDED | $81,493 | $120,980 |
$89,147
1,567,504
kWh
|
$18,039
-
kW-mo/yr
|
$(-52,528.0)
-
MMBtu
|
$26,835
-
MMBtu
|
||
TOTAL IMPLEMENTED | $965 | $800 |
$508
9,353
kWh
|
- | - |
$457
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #4 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs