ITAC Assessment: MA0503
ITAC logo
ITAC Assessment: MA0503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Abrasive stones
NAICS
n/a
SIC 3291: Abrasive Products
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 90,000
ft2
Annual Production 1,225,000
lb
Production Hrs. Annual 8,450
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $195,791 3,618,000
kWh
Electricity Demand $80,079 9,076
kW-mo/yr
Electricity Fees $1,482 -
Fuel Oil #4 $59,137 9,360
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,493 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $965

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #4 Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $46,957 $57,500 n/a $78,325
1,442,442
kWh
$17,872
-
kW-mo/yr
$(-49,240.0)
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $5,668 $14,000 n/a - - - $5,668
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $12,833 $13,000 n/a - - - $12,833
-
MMBtu
04 2.3212: Optimize plant power factor $12,423 $7,500 $4,546
9,486
kWh
- - $7,877
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,038 $10,000 $2,790
51,383
kWh
- $(-1,752.0)
-
MMBtu
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $911 $6,000 $2,447
45,068
kWh
- $(-1,536.0)
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $698 $12,180 $531
9,772
kWh
$167
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $508 $300 $508
9,353
kWh
- - -
09 2.2511: Insulate bare equipment $457 $500 - - - $457
-
MMBtu
TOTAL RECOMMENDED $81,493 $120,980 $89,147
1,567,504
kWh
$18,039
-
kW-mo/yr
$(-52,528.0)
-
MMBtu
$26,835
-
MMBtu
TOTAL IMPLEMENTED $965 $800 $508
9,353
kWh
- - $457
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs