ITAC Assessment: SF0001
ITAC logo
ITAC Assessment: SF0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Maraschino Cherries
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 40,276
ft2
Annual Production 6,050,000
lb
Production Hrs. Annual 2,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,135 393,318
kWh
Natural Gas $115,437 31,929
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,631

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $714 $150 $714
7,327
kWh
-
02 2.2449: Recover heat from exhausted steam, hot air or hot water $8,086 $14,000 - $8,086
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,366 $800 - $1,366
-
MMBtu
04 2.1213: Direct warmest air to combustion intake $344 $625 - $344
-
MMBtu
05 2.2192: Use heat exchange fluids instead of steam in pipeline tracing systems $4,962 $8,490 - $4,962
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $1,082 $2,149 - $1,082
-
MMBtu
07 2.2449: Recover heat from exhausted steam, hot air or hot water $2,077 $4,000 $2,077
21,102
kWh
-
TOTAL RECOMMENDED $18,631 $30,214 $2,791
28,429
kWh
$15,840
-
MMBtu
TOTAL IMPLEMENTED $18,631 $30,214 $2,791
28,429
kWh
$15,840
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs