ITAC Assessment: AS0542
ITAC logo
ITAC Assessment: AS0542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product banking services
NAICS 522110: Commercial Banking
SIC 6021: National Commercial Banks
Sales Range $1
M
to 5
M
# of Employees 250
Plant Area 71,166
ft2
Annual Production 1
units
Production Hrs. Annual 3,002
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,520 1,102,560
kWh
Electricity Demand $29,448 2,677
kW-mo/yr
Electricity Fees $10,332 -
Natural Gas $15,866 2,013
MMBtu
Waste Disposal Costs
Water Usage $1,866 310
Tgal
TOTAL YEARLY COSTS $148,032
RECOMMENDED SAVINGS* $25,902 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,554

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,466 $22,203 $6,546
79,734
kWh
$2,800
-
kW-mo/yr
$2,120
02 4.611: Begin a practice of predictive / preventative maintenance $9,017 $19,689 $9,017
109,829
kWh
- -
03 2.7272: Install heat pipes / raise cooling setpoint $5,088 $71 $2,546
31,006
kWh
$2,542
-
kW-mo/yr
-
04 3.1161: Eliminate/reduce an operation $331 $50 $89
1,080
kWh
$242
-
kW-mo/yr
-
TOTAL RECOMMENDED $25,902 $42,013 $18,198
221,649
kWh
$5,584
-
kW-mo/yr
$2,120
TOTAL IMPLEMENTED $16,554 $22,274 $9,092
110,740
kWh
$5,342
-
kW-mo/yr
$2,120
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs