ITAC Assessment: SU0131
ITAC logo
ITAC Assessment: SU0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Electronic Controls
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 285
Plant Area 26,000
ft2
Annual Production 1,600,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,207 1,056,720
kWh
Natural Gas $9,850 1,303
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,207 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,772

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 3.1171: Change product specs $14,930 $2,500 - - - $14,930
02 3.1161: Eliminate/reduce an operation $2,391 $115 - - $2,391
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $997 $102 - - $997
-
MMBtu
-
04 2.7111: Reduce illumination to minimum necessary levels $917 $115 $639
7,987
kWh
$278
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $775 $193 $775
9,696
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $197 - $197
2,464
kWh
- - -
TOTAL RECOMMENDED $20,207 $3,025 $1,611
20,147
kWh
$278
-
kW-mo/yr
$3,388
-
MMBtu
$14,930
TOTAL IMPLEMENTED $1,772 $295 $775
9,696
kWh
- $997
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs