| Assessment Year | 1988 |
|---|---|
| Principal Product | METAL OFFICE FURN. FRAME |
| NAICS |
n/a
|
| SIC | 2522: Office Furniture, Except Wood |
| Sales Range | $10 M to 50M |
| # of Employees | 400 |
| Plant Area |
n/a
|
| Annual Production | 367,000
pieces
|
| Production Hrs. Annual | 4,560
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $98,272 | 1,218,054 |
kWh
|
$0.081 |
| Natural Gas | $17,005 | 4,197 |
MMBtu
|
$4.05 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,246 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,740 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $7,460 | $9,000 | - |
$7,460
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,440 | $10,000 |
$5,440
67,409
kWh
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $520 | $60 |
$520
6,448
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,679 | $2,000 |
$1,679
20,809
kWh
|
- | - | |
| 05 | 2.1123: Install automatic stack damper | $1,207 | $1,650 | - |
$1,207
-
MMBtu
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $378 | - | - |
$628
-
MMBtu
|
$(-250.0) | |
| 07 | 2.6121: Reduce hot water temperature to the minimum required | $316 | - | - |
$316
-
MMBtu
|
- | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $260 | - |
$260
3,224
kWh
|
- | - | |
| 09 | 2.8121: Apply for tax-free status for energy purchases | $986 | - |
$986
-
kWh
|
- | - | |
| TOTAL RECOMMENDED | $18,246 | $22,710 |
$8,885
97,890
kWh
|
$9,611
-
MMBtu
|
$(-250.0) | ||
| TOTAL IMPLEMENTED | $16,740 | $22,650 |
$7,379
91,442
kWh
|
$9,611
-
MMBtu
|
$(-250.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs