1,528
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
MS0440 #05 Y:2024 | 05 | 2024 | Install occupancy sensors | $622 | $2,945 | |
MS0440 #04 Y:2024 | 04 | 2024 | Use solar heat to make electricty | $193,096 | $2,257,766 | |
MS0440 #02 Y:2024 | 02 | 2024 | Replace fossil fuel equipment with electrical equipment | $79,176 | $275,000 | |
TT0325 #11 Y:2024 | 11 | 2024 | Use most efficient type of electric motors | $718 | $2,640 | |
TT0325 #07 Y:2024 | 07 | 2024 | Eliminate or reduce compressed air usage | $5,049 | $30,040 | |
TT0325 #06 Y:2024 | 06 | 2024 | Turn off equipment when not in use | $5,854 | $400 | |
TT0325 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $5,974 | $16,000 | |
TT0325 #04 Y:2024 | 04 | 2024 | Use heat from boiler blowdown to preheat boiler feed water | $8,824 | $22,500 | |
TT0325 #03 Y:2024 | 03 | 2024 | Preheat boiler makeup water with waste process heat | $30,978 | $17,480 | |
TT0325 #01 Y:2024 | 01 | 2024 | Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $242,348 | $1,045,217 | |
TT0318 #08 Y:2024 | 08 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $1,783 | $460 | |
TT0318 #07 Y:2024 | 07 | 2024 | Replace city water with recycled water via cooling tower | $4,912 | $15,000 | |
TT0318 #06 Y:2024 | 06 | 2024 | Preheat boiler makeup water with waste process heat | $5,885 | $12,180 | |
TT0318 #05 Y:2024 | 05 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,815 | $1,500 | |
TT0318 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $519,539 | $7,626,292 | |
MS0429 #02 Y:2024 | 02 | 2024 | Use solar heat to make electricty | $5,847 | $35,728 | |
MS0429 #01 Y:2024 | 01 | 2024 | Utilize higher efficiency lamps and/or ballasts | $2,731 | $8,233 | |
MS0428 #03 Y:2024 | 03 | 2024 | Optimize plant power factor | $788 | $1,677 | |
MS0428 #02 Y:2024 | 02 | 2024 | Reduce the pressure of compressed air to the minimum required | $647 | - | |
MS0428 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $11,631 | $131,059 |