Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,443

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0417 #04 Y:2023 Use solar heat to make electricty $210,258 $2,164,995
MS0417 #02 Y:2023 Utilize sensors controlling roof and wall openings $2,264 $21,500
MS0417 #01 Y:2023 Install occupancy sensors $1,912 $3,171
TT0293 #05 Y:2023 Substitute compressed air cooling with water or air cooling $3,025 $10,040
MS0406 #02 Y:2022 Reduce the pressure of compressed air to the minimum required $1,570 -
MS0406 #01 Y:2022 Replace boiler $17,347 $165,000
MS0405 #04 Y:2022 Use solar heat to make electricty $6,755 $43,645
MS0405 #03 Y:2022 Combine utility meters $279 -
MS0405 #02 Y:2022 Utilize higher efficiency lamps and/or ballasts $1,475 $2,866
MS0405 #01 Y:2022 Replace existing hvac unit with high efficiency model $2,844 $3,550
MS0404 #04 Y:2022 Optimize plant power factor $14,973 $3,790
MS0404 #03 Y:2022 Use properly designed and sized hvac equipment $853 $525
MS0404 #02 Y:2022 Use insulation in furnaces to facilitate heating / cooling $9,805 $22,420
MS0404 #01 Y:2022 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $176,387 $1,148,430
MS0403 #04 Y:2022 Replace existing hvac unit with high efficiency model $881 $5,800
MS0403 #03 Y:2022 Install occupancy sensors $298 $324
MS0403 #02 Y:2022 Install timers on light switches in little used areas $1,349 $105
MS0402 #03 Y:2022 Insulate bare equipment $1,180 $2,290
MS0402 #02 Y:2022 Use most efficient type of electric motors $7,486 $20,845
MS0402 #01 Y:2022 Optimize plant power factor $1,171 $3,039