ITAC Assessment: MS0428
ITAC logo
ITAC Assessment: MS0428
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Armored Vehicles
NAICS 336992: Military Armored Vehicle, Tank, and Tank Component Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 120,000
ft2
Annual Production 320
units
Production Hrs. Annual 2,550
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,923 1,310,100
kWh
Electricity Demand $33,480 2,825
kW-mo/yr
Natural Gas $9,942 495
MMBtu
Waste Disposal Costs
Water Usage $2,066 159
Tgal
TOTAL YEARLY COSTS $115,410
RECOMMENDED SAVINGS* $13,066 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $11,631 $131,059 $11,631
228,053
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $647 - $647
12,442
kWh
-
03 2.3212: Optimize plant power factor $788 $1,677 - $788
-
kW-mo/yr
TOTAL RECOMMENDED $13,066 $132,736 $12,278
240,495
kWh
$788
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs