Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,404

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0830 #06 Y:2021 Reduce temperature of process equipment when on standby $4,017 $2,500
MA0830 #05 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $35,055 $20,800
MA0830 #04 Y:2021 Moderate cooling tower outlet temperature $9,470 $2,500
MA0830 #03 Y:2021 Recover waste heat from equipment $15,862 $65,410
MA0830 #02 Y:2021 Reduce combustion air flow to optimum $40,790 $80,000
MA0830 #01 Y:2021 Recover heat from exhausted steam, hot air or hot water $118,337 $192,000
MA0829 #05 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $3,278 $15,850
MA0829 #04 Y:2021 Apply for tax-free status for energy purchases $3,485 $1,000
MA0829 #02 Y:2021 Insulate bare equipment $6,782 $8,620
MA0829 #01 Y:2021 Use cooling tower or economizer to replace chiller cooling $34,736 $24,400
MA0828 #06 Y:2021 Insulate bare equipment $522 $910
MA0828 #05 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $10,386 $12,000
MA0828 #04 Y:2021 Recover waste heat from equipment $29,256 $3,515
MA0828 #03 Y:2021 Use solar heat to make electricty $64,198 $280,195
MA0828 #02 Y:2021 Use hot process fluids to preheat incoming process fluids $127,245 $144,842
MA0828 #01 Y:2021 Add equipment/ operators to reduce production bottleneck $443,207 $3,043,367
MA0827 #07 Y:2021 Insulate bare equipment $801 $1,550
MA0827 #06 Y:2021 Minimize water usage $1,374 $3,230
MA0827 #05 Y:2021 Use cooling tower or economizer to replace chiller cooling $2,962 $10,800