Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,430

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0312 #10 Y:2024 Turn off equipment during breaks, reduce operating time $2,155 $4,810
TT0312 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $2,253 $3,000
TT0312 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $10,740 $11,250
TT0312 #06 Y:2024 Install motor voltage controller on lightly loaded motors $14,000 $12,000
TT0312 #04 Y:2024 Insulate bare equipment $9,940 $2,262
TT0312 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $1,728 $30
UL2318 #07 Y:2023 Use solar heat to make electricty $59,688 $501,748
UL2318 #06 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,695 $2,160
UL2318 #05 Y:2023 Reduce the pressure of compressed air to the minimum required $1,113 -
UL2318 #04 Y:2023 Install spectral reflectors / delamp $1,046 -
UL2318 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $17,544 $12,786
UL2318 #02 Y:2023 Install occupancy sensors $1,925 $6,408
UL2318 #01 Y:2023 Optimize plant power factor $14,952 $10,400
UL2317 #05 Y:2023 Optimize plant power factor $6,865 $9,100
UL2317 #04 Y:2023 Install spectral reflectors / delamp $2,720 $500
UL2317 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $2,022 $2,077
UL2317 #01 Y:2023 Use solar heat to make electricty $16,039 $148,666
UL2316 #06 Y:2023 Install hydrogen fuel cell $281,388 $1,750,000
UL2316 #05 Y:2023 Improve air circulation with destratification fans / other methods $15,036 $20,000
UL2316 #03 Y:2023 Use solar heat to make electricty $112,167 $989,084