| Assessment Year | 2024 |
|---|---|
| Principal Product | Packaged Goods |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 225 |
| Plant Area |
469,000
ft2
|
| Annual Production | 358,493
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $57,579 | 1,605,760 |
kWh
|
$0.036 |
| Electricity Demand | $151,672 | 5,902 |
kW-mo/yr
|
$25.70 |
| Electricity Fees | $30,053 | - |
|
- |
| Natural Gas | $26,506 | 1,847 |
MMBtu
|
$14.35 |
| TOTAL YEARLY COSTS | $265,810 | |||
| RECOMMENDED SAVINGS* | $99,963 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $14,952 | $10,400 | - | - | $14,952 | |
| 02 | 2.7135: Install occupancy sensors | $1,925 | $6,408 |
$1,925
53,630
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,544 | $12,786 |
$3,225
89,925
kWh
|
$14,319
-
kW-mo/yr
|
- | |
| 04 | 2.7144: Install spectral reflectors / delamp | $1,046 | - |
$204
5,679
kWh
|
$842
-
kW-mo/yr
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,113 | - |
$1,113
31,021
kWh
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,695 | $2,160 |
$3,695
103,027
kWh
|
- | - | |
| 07 | 2.9114: Use solar heat to make electricty | $59,688 | $501,748 |
$26,230
731,444
kWh
|
$33,458
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $99,963 | $533,502 |
$36,392
1,014,726
kWh
|
$48,619
-
kW-mo/yr
|
$14,952 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs