ITAC Assessment: TT0312
ITAC logo
ITAC Assessment: TT0312
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastic Fuel Containers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 115,000
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $326,274 4,520,280
kWh
Electricity Demand $143,082 10,359
kW-mo/yr
Natural Gas $4,280 569
MMBtu
Waste Disposal Costs
Water Usage $2,528 904
Tgal
Water Disposal $5,884 904
Tgal
TOTAL YEARLY COSTS $482,048
RECOMMENDED SAVINGS* $112,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $36,945 - - $36,945
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,728 $30 $1,728
23,940
kWh
-
03 2.6218: Turn off equipment when not in use $30,815 $6,360 $30,815
426,193
kWh
-
04 2.2511: Insulate bare equipment $9,940 $2,262 $9,940
137,699
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,292 $635 $2,292
31,751
kWh
-
06 2.4113: Install motor voltage controller on lightly loaded motors $14,000 $12,000 - $14,000
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,740 $11,250 $10,740
148,800
kWh
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,253 $3,000 $2,253
31,215
kWh
-
09 2.7135: Install occupancy sensors $1,294 $1,860 $1,294
17,928
kWh
-
10 2.6212: Turn off equipment during breaks, reduce operating time $2,155 $4,810 $2,155
29,861
kWh
-
TOTAL RECOMMENDED $112,162 $42,207 $61,217
847,387
kWh
$50,945
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs