ITAC Assessment: UL2316
ITAC logo
ITAC Assessment: UL2316
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Hair Care Products
NAICS 325620: Toilet Preparation Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 682,976
ft2
Annual Production 2,700,000
units
Production Hrs. Annual 7,488
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,175,467 18,902,219
kWh
Electricity Demand $568,348 40,877
kW-mo/yr
Electricity Fees $245,182 -
Natural Gas $202,836 76,659
MMBtu
TOTAL YEARLY COSTS $2,191,833
RECOMMENDED SAVINGS* $503,856 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,018

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $14,992 - $12,457
200,928
kWh
$2,535
-
kW-mo/yr
-
02 2.2692: Use outside cold water source as a supply of cooling water $73,247 $137,300 $73,247
1,177,851
kWh
- -
03 2.9114: Use solar heat to make electricty $112,167 $989,084 $76,486
1,229,942
kWh
$35,681
-
kW-mo/yr
-
04 2.7224: Reduce space conditioning during non-working hours $7,026 - $5,890
94,995
kWh
- $1,136
-
MMBtu
05 2.7243: Improve air circulation with destratification fans / other methods $15,036 $20,000 $15,036
242,511
kWh
- -
06 2.9131: Install hydrogen fuel cell $281,388 $1,750,000 $271,560
4,426,419
kWh
$83,400
-
kW-mo/yr
$(-73,572.0)
-
MMBtu
TOTAL RECOMMENDED $503,856 $2,896,384 $454,676
7,372,646
kWh
$121,616
-
kW-mo/yr
$(-72,436.0)
-
MMBtu
TOTAL IMPLEMENTED $22,018 - $18,347
295,923
kWh
$2,535
-
kW-mo/yr
$1,136
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs