ITAC Assessment: SF0404
ITAC logo
ITAC Assessment: SF0404
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Fresh Mozzarella
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $50
M
to 100
M
# of Employees 460
Plant Area 50,700
ft2
Annual Production 11,000,000
lb
Production Hrs. Annual 6,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $360,826 4,765,832
kWh
Electricity Demand $240,706 14,238
kW-mo/yr
Electricity Fees $32,924 -
Natural Gas $158,640 30,906
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,071 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,807

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1212: Operate boilers on high fire setting $2,708 - - - $2,708
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,243 - $2,243
30,108
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $257 $22 $170
2,154
kWh
$87
-
kW-mo/yr
-
04 2.2136: Install / repair insulation on steam lines $17,934 $5,426 - - $17,934
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,812 $2,778 $5,812
78,023
kWh
- -
06 2.2621: Modify refrigeration system to operate at a lower pressure $16,688 $12,500 $12,730
170,879
kWh
$3,958
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,681 $5,213 $3,962
53,175
kWh
$2,719
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $697 $1,356 $435
5,844
kWh
$262
-
kW-mo/yr
-
09 2.4221: Install compressor air intakes in coolest locations $483 $901 $268
3,595
kWh
$215
-
kW-mo/yr
-
10 2.7132: Install timers on light switches in little used areas $676 $1,569 $333
4,467
kWh
$343
-
kW-mo/yr
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $10,910 $55,222 $8,287
111,236
kWh
$2,623
-
kW-mo/yr
-
12 2.2437: Recover waste heat from equipment $3,982 $20,358 - - $3,982
-
MMBtu
TOTAL RECOMMENDED $69,071 $105,345 $34,240
459,481
kWh
$10,207
-
kW-mo/yr
$24,624
-
MMBtu
TOTAL IMPLEMENTED $21,807 $8,373 $3,181
42,573
kWh
$692
-
kW-mo/yr
$17,934
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs