ITAC Assessment: MA0062
ITAC logo
ITAC Assessment: MA0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CHAINS,NAILS,GREY IRON
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 480,000
lb
Production Hrs. Annual 3,000
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $351,186 4,527,550
kWh
Natural Gas $150,462 28,067
MMBtu
Fuel Oil #6 $470,400 93,845
MMBtu
Other Energy $160,000 25,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,091

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $16,443 $20,000 $21,517
277,550
kWh
$(-5,074.0)
-
MMBtu
02 2.2514: Cover open tanks $1,079 $605 - $1,079
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $3,903 $2,200 $3,903
50,410
kWh
-
04 2.2136: Install / repair insulation on steam lines $202 $140 - $202
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $446 $30 - $446
-
MMBtu
TOTAL RECOMMENDED $22,073 $22,975 $25,420
327,960
kWh
$(-3,347.0)
-
MMBtu
TOTAL IMPLEMENTED $17,091 $20,170 $21,517
277,550
kWh
$(-4,426.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs