Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,971

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0211 #08 Y:2025 Install steam trap $2,051 $4,950
IP0211 #07 Y:2025 Eliminate cooling of process streams which subsequently must be heated and vice versa $76,792 $70,000
IP0211 #06 Y:2025 Install occupancy sensors $1,149 $361
IP0211 #05 Y:2025 Install compressor air intakes in coolest locations $1,605 $573
IP0211 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,109 $25
IP0211 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $820 -
IP0211 #02 Y:2025 Eliminate or reduce compressed air usage $3,506 -
IP0211 #01 Y:2025 Reduce space conditioning during non-working hours $4,011 -
MZ0371 #03 Y:2025 Use waste heat from hot flue gases to preheat incoming fluids $1,555 $5,880
MZ0371 #02 Y:2025 Use flue gases to heat process or service water $1,063 $3,900
MZ0371 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,847 $3,600
IC0324 #07 Y:2024 Use or replace with energy efficient substitutes $4,575 $44,208
IC0324 #06 Y:2024 Clean or color roof to reduce solar load $19,325 $143,593
IC0324 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,110 $1,610
IC0324 #01 Y:2024 Use solar heat to make electricty $65,101 $294,166
IC0323 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $130 $288
IC0323 #06 Y:2024 Replace boiler $5,000 $39,055
IC0323 #02 Y:2024 Use demand controller or load shedder $549 $2,512
IC0323 #01 Y:2024 Use solar heat to make electricty $47,182 $233,599
IC0322 #11 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $205 $144