ITAC Assessment: IC0312
ITAC logo
ITAC Assessment: IC0312
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Office Space
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6541: Title Abstract Offices
Sales Range less than $500
k
# of Employees 999
Plant Area 90,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,080
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,623 1,964,160
kWh
Electricity Demand $149,664 8,315
kW-mo/yr
TOTAL YEARLY COSTS $308,287
RECOMMENDED SAVINGS* $389,199 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $70,425 $212,126 $43,630
538,636
kWh
$26,795
-
kW-mo/yr
02 2.7135: Install occupancy sensors $43,524 $26,950 $20,051
247,541
kWh
$23,473
-
kW-mo/yr
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,867 $1,676 $1,347
16,625
kWh
$521
-
kW-mo/yr
04 2.9114: Use solar heat to make electricty $196,644 $810,434 $77,748
959,855
kWh
$118,895
-
kW-mo/yr
05 2.6218: Turn off equipment when not in use $3,685 - $2,825
34,874
kWh
$860
-
kW-mo/yr
06 3.1161: Eliminate/reduce an operation $70,893 - $69,140
853,574
kWh
$1,754
-
kW-mo/yr
07 2.6213: Turn off steam / hot water lines leading to space heating units $2,161 - $799
9,866
kWh
$1,362
-
kW-mo/yr
TOTAL RECOMMENDED $389,199 $1,051,186 $215,539
2,660,971
kWh
$173,660
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs