ITAC Assessment: IC0315
ITAC logo
ITAC Assessment: IC0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fabricated Tube Assemblies, Sheet Metal Fabrication and Enclosures
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3324: Steel Investment Foundries
Sales Range $50
M
to 100
M
# of Employees 227
Plant Area 154,012
ft2
Annual Production 667,513
units
Production Hrs. Annual 7,072
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,104 2,770,353
kWh
Electricity Demand $59,029 6,235
kW-mo/yr
Electricity Fees $32,433 -
Natural Gas $514,579 54,065
MMBtu
Waste Disposal Costs
Water Usage $130,623 1,963
Tgal
TOTAL YEARLY COSTS $900,767
RECOMMENDED SAVINGS* $493,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $82,148 $379,057 $42,932
727,667
kWh
$39,215
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,959 $820 $217
3,682
kWh
$1,742
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,478 $227 $1,161
19,685
kWh
$316
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $1,069 $442 $841
14,255
kWh
$228
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $6,223 $2,225 - - $6,223
-
MMBtu
06 2.7135: Install occupancy sensors $1,133 $1,850 $715
12,119
kWh
$418
-
kW-mo/yr
-
07 2.4239: Eliminate or reduce compressed air usage $14,991 $7,497 $9,034
153,117
kWh
$5,957
-
kW-mo/yr
-
08 2.4322: Use or replace with energy efficient substitutes $525 $242 $363
6,160
kWh
$161
-
kW-mo/yr
-
09 2.3132: Recharge batteries on during off-peak demand periods $2,224 - - $2,224
-
kW-mo/yr
-
10 2.5113: Use direct flame impingement or infrared processing for chamber type heating $369,968 $14,366 - - $369,968
-
MMBtu
11 2.5113: Use direct flame impingement or infrared processing for chamber type heating $12,134 $7,693 - - $12,134
-
MMBtu
TOTAL RECOMMENDED $493,852 $414,419 $55,265
936,685
kWh
$50,263
-
kW-mo/yr
$388,325
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs