Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,212

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0682 #15 Y:2025 Eliminate or reduce compressed air usage $1,069 $1,258
WV0682 #14 Y:2025 Eliminate or reduce compressed air usage $3,661 $900
WV0682 #11 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,702 $378
WV0682 #10 Y:2025 Develop a repair/replace policy $5,033 $8,967
WV0682 #09 Y:2025 Analyze flue gas for proper air/fuel ratio $6,955 $3,160
WV0682 #06 Y:2025 Install occupancy sensors $13,054 $14,058
WV0682 #05 Y:2025 Insulate bare equipment $17,044 $488
WV0682 #04 Y:2025 Establish a predictive maintenance program $17,883 $6,000
WV0682 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $18,561 $12,599
WV0673 #12 Y:2024 Reduce the pressure of compressed air to the minimum required $179 $80
WV0673 #11 Y:2024 Eliminate or reduce compressed air usage $470 $887
WV0673 #09 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $620 $560
WV0673 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,382 $16,575
WV0673 #05 Y:2024 Insulate bare equipment $4,399 $2,317
WV0673 #04 Y:2024 Use optimum size and capacity equipment $5,359 $6,620
WV0673 #03 Y:2024 Install occupancy sensors $6,139 $11,569
DL0242 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,049 $191
DL0242 #02 Y:2024 Utilize controls to operate equipment only when needed $4,258 -
DL0242 #01 Y:2024 Utilize controls to operate equipment only when needed $12,043 -
WV0665 #12 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,582 $375