ITAC Assessment: WV0665
ITAC logo
ITAC Assessment: WV0665
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Cabinet doors, frames, door fronts
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 240,000
ft2
Annual Production 1,800,000
units
Production Hrs. Annual 3,840
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,149,572 13,955,120
kWh
Natural Gas $239,985 35,137
MMBtu
TOTAL YEARLY COSTS $1,389,557
RECOMMENDED SAVINGS* $202,078 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $100,715 $390,000 $100,715
1,222,272
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $61,926 $238,677 $61,926
751,524
kWh
- -
03 2.4224: Upgrade controls on compressors $7,375 $13,475 $7,375
89,497
kWh
- -
04 2.2425: Use flue gases to heat process or service water $7,315 $22,800 - $7,315
-
MMBtu
-
05 2.4157: Establish a predictive maintenance program $6,272 $1,500 $7,189
87,245
kWh
- $(-917.0)
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,064 $3,296 $5,064
61,451
kWh
- -
07 2.2511: Insulate bare equipment $3,763 $2,971 - $3,763
-
MMBtu
-
08 2.1233: Analyze flue gas for proper air/fuel ratio $2,306 $1,070 - $2,306
-
MMBtu
-
09 2.4151: Develop a repair/replace policy $2,096 $1,417 $2,696
32,717
kWh
- $(-600.0)
10 2.4231: Reduce the pressure of compressed air to the minimum required $1,835 $150 $1,835
22,273
kWh
- -
11 2.4221: Install compressor air intakes in coolest locations $1,829 $9,140 $1,344
16,305
kWh
$485
-
MMBtu
-
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,582 $375 $1,582
19,193
kWh
- -
TOTAL RECOMMENDED $202,078 $684,871 $189,726
2,302,477
kWh
$13,869
-
MMBtu
$(-1,517.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs