ITAC Assessment: NC0442
ITAC logo
ITAC Assessment: NC0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Railroad ties
NAICS 321114: Wood Preservation
SIC 2491: Wood Preserving
Sales Range $10
M
to 50
M
# of Employees 59
Plant Area 52,000
ft2
Annual Production 3,283,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,546 3,826,800
kWh
Electricity Demand $92,342 9,063
kW-mo/yr
Wood $232,273 91,583
MMBtu
Other Energy $1 39,250
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,863

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1243: Use heat from boiler blowdown to preheat boiler feed water $9,357 $35,000 - - $9,281
-
MMBtu
$76
-
Tgal
- -
02 2.2414: Use waste heat from hot flue gases to preheat $44,787 $200,000 - - $44,787
-
MMBtu
- - -
03 2.2127: Flash condensate to produce lower pressure steam $4,788 $20,000 - - $4,788
-
MMBtu
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,196 $4,425 $1,606
40,827
kWh
$590
-
kW-mo/yr
- - - -
05 2.4151: Develop a repair/replace policy $3,045 $6,067 $1,985
50,466
kWh
$1,060
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,418 $9,330 $3,224
81,959
kWh
$1,194
-
kW-mo/yr
- - - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $977 $231 $713
18,129
kWh
$264
-
kW-mo/yr
- - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,227 $300 $1,508
38,338
kWh
$559
-
kW-mo/yr
- - $(-600.0) $(-240.0)
TOTAL RECOMMENDED $70,795 $275,353 $9,036
229,719
kWh
$3,667
-
kW-mo/yr
$58,856
-
MMBtu
$76
-
Tgal
$(-600.0) $(-240.0)
TOTAL IMPLEMENTED $11,863 $20,353 $9,036
229,719
kWh
$3,667
-
kW-mo/yr
- - $(-600.0) $(-240.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs