Assessment Year | 2024 |
---|---|
Principal Product | Flavored uncarbonated beverage |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
300,000
ft2
|
Annual Production | 151,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $3,423,595 | 41,257,744 |
kWh
|
$0.083 | |
Electricity Demand | $637,133 | 76,166 |
kW-mo/yr
|
$8.37 | |
Electricity Fees | $1,299 | - |
|
- | |
Natural Gas | $534,836 | 241,993 |
MMBtu
|
$2.21 | |
Waste Disposal Costs | |||||
Water Usage | $2,255,000 | 250,000 |
Tgal
|
$9.02 | |
TOTAL YEARLY COSTS | $6,851,863 | ||||
RECOMMENDED SAVINGS* | $677,314 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $17,306 | $1,250 |
$14,657
176,594
kWh
|
$2,649
-
kW-mo/yr
|
- | - | |
02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $6,623 | $17,500 |
$5,610
67,586
kWh
|
$1,013
-
kW-mo/yr
|
- | - | |
03 | 2.1242: Minimize boiler blowdown with better feedwater treatment | $37,050 | $110,000 | - | - |
$13,329
-
MMBtu
|
$23,721
-
Tgal
|
|
04 | 2.2122: Install / repair insulation on condensate lines | $61,029 | $10,000 | - | - |
$25,448
-
MMBtu
|
$35,581
-
Tgal
|
|
05 | 2.2441: Preheat boiler makeup water with waste process heat | $9,543 | $2,247 | - | - |
$9,543
-
MMBtu
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $397,405 | $140,000 |
$336,578
4,055,152
kWh
|
$60,827
-
kW-mo/yr
|
- | - | |
07 | 2.4224: Upgrade controls on compressors | $61,587 | $28,225 |
$52,160
628,435
kWh
|
$9,427
-
kW-mo/yr
|
- | - | |
08 | 2.4133: Use most efficient type of electric motors | $42,185 | $51,431 |
$35,728
430,454
kWh
|
$6,457
-
kW-mo/yr
|
- | - | |
09 | 2.4322: Use or replace with energy efficient substitutes | $44,586 | $1,934 |
$37,761
454,955
kWh
|
$6,825
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $677,314 | $362,587 |
$482,494
5,813,176
kWh
|
$87,198
-
kW-mo/yr
|
$48,320
-
MMBtu
|
$59,302
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs