ITAC Assessment: DL0239
ITAC logo
ITAC Assessment: DL0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Flavored uncarbonated beverage
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 300,000
ft2
Annual Production 151,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,423,595 41,257,744
kWh
Electricity Demand $637,133 76,166
kW-mo/yr
Electricity Fees $1,299 -
Natural Gas $534,836 241,993
MMBtu
Waste Disposal Costs
Water Usage $2,255,000 250,000
Tgal
TOTAL YEARLY COSTS $6,851,863
RECOMMENDED SAVINGS* $677,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.6231: Utilize controls to operate equipment only when needed $17,306 $1,250 $14,657
176,594
kWh
$2,649
-
kW-mo/yr
- -
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,623 $17,500 $5,610
67,586
kWh
$1,013
-
kW-mo/yr
- -
03 2.1242: Minimize boiler blowdown with better feedwater treatment $37,050 $110,000 - - $13,329
-
MMBtu
$23,721
-
Tgal
04 2.2122: Install / repair insulation on condensate lines $61,029 $10,000 - - $25,448
-
MMBtu
$35,581
-
Tgal
05 2.2441: Preheat boiler makeup water with waste process heat $9,543 $2,247 - - $9,543
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $397,405 $140,000 $336,578
4,055,152
kWh
$60,827
-
kW-mo/yr
- -
07 2.4224: Upgrade controls on compressors $61,587 $28,225 $52,160
628,435
kWh
$9,427
-
kW-mo/yr
- -
08 2.4133: Use most efficient type of electric motors $42,185 $51,431 $35,728
430,454
kWh
$6,457
-
kW-mo/yr
- -
09 2.4322: Use or replace with energy efficient substitutes $44,586 $1,934 $37,761
454,955
kWh
$6,825
-
kW-mo/yr
- -
TOTAL RECOMMENDED $677,314 $362,587 $482,494
5,813,176
kWh
$87,198
-
kW-mo/yr
$48,320
-
MMBtu
$59,302
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs