ITAC Assessment: MO0060
ITAC logo
ITAC Assessment: MO0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product STEEL PIPE AND TUBING
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 132
Plant Area
n/a
Annual Production 80,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $446,695 7,470,985
kWh
LPG $80,685 14,399
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,980 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,261

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,173 $775 $3,470
58,324
kWh
$(-297.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,452 $2,832 $1,452
24,326
kWh
-
03 2.4133: Use most efficient type of electric motors $962 $2,230 $962
16,120
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $322 - $322
5,569
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,377 $5,400 $2,377
39,859
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $3,975 $1,600 $3,975
66,823
kWh
-
07 2.4312: Improve lubrication practices $2,719 - $2,719
45,721
kWh
-
TOTAL RECOMMENDED $14,980 $12,837 $15,277
256,742
kWh
$(-297.0)
TOTAL IMPLEMENTED $12,261 $12,837 $12,558
211,021
kWh
$(-297.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs