Assessment Year | 2010 |
---|---|
Principal Product | Electric Disconnect Equipment |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
500,000
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $803,882 | 21,780,000 |
kWh
|
$0.037 |
Electricity Demand | $333,188 | 3,847 |
kW-mo/yr
|
$86.61 |
Natural Gas | $979,132 | 77,711 |
MMBtu
|
$12.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $104,926 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,236 | $19,740 |
$7,659
178,110
kWh
|
$2,992
-
kW-mo/yr
|
- | $585 | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,893 | $6,240 |
$2,288
53,200
kWh
|
$605
-
kW-mo/yr
|
- | - | - | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $1,148 | - |
$1,148
28,000
kWh
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,589 | $1,000 |
$4,787
111,333
kWh
|
$2,802
-
kW-mo/yr
|
- | - | - | |
05 | 2.4235: Remove or close off unneeded compressed air lines | $2,047 | $12,500 |
$2,047
47,600
kWh
|
- | - | - | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $14,040 | $16,000 | - | - |
$14,040
-
MMBtu
|
- | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,750 | $21,000 | - | - |
$9,750
-
MMBtu
|
- | - | |
08 | 2.2136: Install / repair insulation on steam lines | $2,335 | $2,310 |
$231
5,376
kWh
|
$94
-
kW-mo/yr
|
$2,010
-
MMBtu
|
- | - | |
09 | 2.2514: Cover open tanks | $4,280 | $3,600 | - | - |
$4,280
-
MMBtu
|
- | - | |
10 | 2.3212: Optimize plant power factor | $1,963 | $5,000 | - | - |
$1,963
-
MMBtu
|
- | - | |
11 | 2.6231: Utilize controls to operate equipment only when needed | $800 | $2,500 | - | - |
$800
-
MMBtu
|
- | - | |
12 | 2.1123: Install automatic stack damper | $20,826 | $200 | - | - | - | - |
$20,826
-
Tgal
|
|
13 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,114 | $70,000 |
$806
100,183
kWh
|
$4,308
-
kW-mo/yr
|
- | - | - | |
14 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,930 | $10,000 |
$3,569
83,006
kWh
|
$1,361
-
kW-mo/yr
|
- | - | - | |
15 | 2.1123: Install automatic stack damper | $15,975 | $8,500 | - | - |
$15,975
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $104,926 | $178,590 |
$22,535
606,808
kWh
|
$12,162
-
kW-mo/yr
|
$48,818
-
MMBtu
|
$585 |
$20,826
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Water Consumption Savings |