ITAC Assessment: AM0875
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Custom metal products
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 135
Plant Area 92,000
ft2
Annual Production 1,150,000
pieces
Production Hrs. Annual 6,440
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,214 1,425,000
kWh
Electricity Demand $29,704 3,975
kW-mo/yr
Electricity Fees $11,935 -
Natural Gas $11,933 783
MMBtu
TOTAL YEARLY COSTS $167,786
RECOMMENDED SAVINGS* $33,725 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,355

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $22,785 $7,000 - - $11,393 - $11,392
02 2.4239: Eliminate or reduce compressed air usage $1,370 $900 $1,370
17,100
kWh
- - - -
03 2.7135: Install occupancy sensors $1,130 $460 $1,130
14,180
kWh
- - - -
04 2.4157: Establish a predictive maintenance program $2,630 $4,160 $1,765
22,070
kWh
- - $865 -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,920 $15 $3,240
40,470
kWh
$680
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $965 $15 $770
9,585
kWh
$195
-
kW-mo/yr
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $925 $500 $790
9,830
kWh
$135
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $33,725 $13,050 $9,065
113,235
kWh
$1,010
-
kW-mo/yr
$11,393 $865 $11,392
TOTAL IMPLEMENTED $32,355 $12,150 $7,695
96,135
kWh
$1,010
-
kW-mo/yr
$11,393 $865 $11,392
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs