| Assessment Year | 1993 |
|---|---|
| Principal Product | PRESTRESSED CONCRETE |
| NAICS |
n/a
|
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $10 M to 50M |
| # of Employees | 180 |
| Plant Area |
1,436,680
ft2
|
| Annual Production | 138,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $212,382 | 4,198,124 |
kWh
|
$0.051 |
| Natural Gas | $24,483 | 4,702 |
MMBtu
|
$5.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $90,613 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,701 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,136 | $215 |
$1,136
22,274
kWh
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $383 | $1,267 |
$383
7,620
kWh
|
|
| 03 | 2.7122: Disconnect ballasts | $345 | $480 |
$345
6,741
kWh
|
|
| 04 | 2.7135: Install occupancy sensors | $266 | $104 |
$266
5,275
kWh
|
|
| 05 | 2.4133: Use most efficient type of electric motors | $6,259 | $9,775 |
$6,259
122,802
kWh
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,954 | $1,400 |
$2,954
58,030
kWh
|
|
| 07 | 4.631: Install an uninteruptable power supply | $78,000 | $24,600 |
$78,000
-
kWh
|
|
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $782 | $2,352 |
$782
15,240
kWh
|
|
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $488 | $700 |
$488
7,327
kWh
|
|
| TOTAL RECOMMENDED | $90,613 | $40,893 |
$90,613
245,309
kWh
|
||
| TOTAL IMPLEMENTED | $9,701 | $11,875 |
$9,701
188,159
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs