2,603
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
WV0671 #13 Y:2024 | 13 | 2024 | Reduce the pressure of compressed air to the minimum required | $768 | $176 | |
WV0671 #12 Y:2024 | 12 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $799 | $1,648 | |
WV0671 #09 Y:2024 | 09 | 2024 | Develop a repair/replace policy | $3,020 | $1,180 | |
WV0671 #08 Y:2024 | 08 | 2024 | Minimize operation of equipment maintained in standby condition | $3,623 | $1,200 | |
WV0671 #07 Y:2024 | 07 | 2024 | Install occupancy sensors | $3,901 | $6,364 | |
WV0671 #06 Y:2024 | 06 | 2024 | Chill water to the highest temperature possible | $4,058 | $5,330 | |
WV0671 #05 Y:2024 | 05 | 2024 | Establish a predictive maintenance program | $7,906 | $5,200 | |
WV0671 #04 Y:2024 | 04 | 2024 | Eliminate or reduce compressed air usage | $8,306 | $17,145 | |
WV0671 #02 Y:2024 | 02 | 2024 | Upgrade controls on compressors | $16,714 | $10,679 | |
WV0671 #01 Y:2024 | 01 | 2024 | Utilize higher efficiency lamps and/or ballasts | $18,904 | $15,193 | |
LE0583 #04 Y:2024 | 04 | 2024 | Use optimum size and capacity equipment | $19,014 | $7,000 | |
LE0583 #03 Y:2024 | 03 | 2024 | Recover heat from exhausted steam, hot air or hot water | $344,366 | $63,000 | |
LE0583 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $23,430 | $2,300 | |
LE0573 #05 Y:2024 | 05 | 2024 | Replace existing equipment with more suitable substitutes | $184,074 | $995,727 | |
LE0573 #04 Y:2024 | 04 | 2024 | Replace existing hvac unit with high efficiency model | $1,318 | $5,952 | |
LE0573 #03 Y:2024 | 03 | 2024 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $361,764 | $1,321,539 | |
LE0573 #02 Y:2024 | 02 | 2024 | Replace existing equipment with more suitable substitutes | $8,341 | $20,400 | |
LE0573 #01 Y:2024 | 01 | 2024 | Utilize higher efficiency lamps and/or ballasts | $4,259 | $4,198 | |
LE0582 #09 Y:2024 | 09 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,102 | $5,494 | |
LE0582 #04 Y:2024 | 04 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,259 | $2,600 |