Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,601

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0671 #13 Y:2024 Reduce the pressure of compressed air to the minimum required $768 $176
WV0671 #12 Y:2024 Utilize energy-efficient belts and other improved mechanisms $799 $1,648
WV0671 #09 Y:2024 Develop a repair/replace policy $3,020 $1,180
WV0671 #08 Y:2024 Minimize operation of equipment maintained in standby condition $3,623 $1,200
WV0671 #07 Y:2024 Install occupancy sensors $3,901 $6,364
WV0671 #05 Y:2024 Establish a predictive maintenance program $7,906 $5,200
WV0671 #04 Y:2024 Eliminate or reduce compressed air usage $8,306 $17,145
WV0671 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $18,904 $15,193
LE0583 #04 Y:2024 Use optimum size and capacity equipment $19,014 $7,000
LE0583 #03 Y:2024 Recover heat from exhausted steam, hot air or hot water $344,366 $63,000
LE0583 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $23,430 $2,300
LE0573 #05 Y:2024 Replace existing equipment with more suitable substitutes $184,074 $995,727
LE0573 #04 Y:2024 Replace existing hvac unit with high efficiency model $1,318 $5,952
LE0573 #03 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $361,764 $1,321,539
LE0573 #02 Y:2024 Replace existing equipment with more suitable substitutes $8,341 $20,400
LE0573 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,259 $4,198
LE0582 #09 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,102 $5,494
LE0582 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,259 $2,600
LE0582 #03 Y:2024 Re-use or recycle hot or cold process exhaust air $7,934 $5,000
LE0582 #02 Y:2024 Install timers and/or thermostats $2,331 $1,140