ITAC Assessment: WV0671
ITAC logo
ITAC Assessment: WV0671
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Injection/Compression molded plastic
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3466: Crowns and Closures
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 128,000
ft2
Annual Production 2,900,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,037,931 14,449,664
kWh
Electricity Demand $104,699 24,513
kW-mo/yr
Natural Gas $6,163 1,860
MMBtu
TOTAL YEARLY COSTS $1,148,793
RECOMMENDED SAVINGS* $88,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,904 $15,193 $17,478
243,420
kWh
$1,426
-
kW-mo/yr
- - -
02 2.4224: Upgrade controls on compressors $16,714 $10,679 $15,809
187,533
kWh
$905
-
kW-mo/yr
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,594 $38,917 $14,574
202,987
kWh
$2,020
-
kW-mo/yr
- - -
04 2.4239: Eliminate or reduce compressed air usage $8,306 $17,145 $7,678
106,941
kWh
$628
-
kW-mo/yr
- - -
05 2.4157: Establish a predictive maintenance program $7,906 $5,200 $12,541
174,661
kWh
$1,025
-
kW-mo/yr
- $(-5,660.0) -
06 2.2625: Chill water to the highest temperature possible $4,058 $5,330 $3,751
52,244
kWh
$307
-
kW-mo/yr
- - -
07 2.7135: Install occupancy sensors $3,901 $6,364 $3,596
50,084
kWh
$305
-
kW-mo/yr
- - -
08 2.6242: Minimize operation of equipment maintained in standby condition $3,623 $1,200 $3,350
46,656
kWh
$273
-
kW-mo/yr
- - -
09 2.4151: Develop a repair/replace policy $3,020 $1,180 $2,822
39,299
kWh
$231
-
kW-mo/yr
- - $(-33.0)
10 2.4221: Install compressor air intakes in coolest locations $1,918 $2,094 $1,721
23,964
kWh
$141
-
kW-mo/yr
$56
-
MMBtu
- -
11 2.7241: Install outside air damper / economizer on hvac unit $1,525 $7,504 $1,260
14,943
kWh
$265
-
kW-mo/yr
- - -
12 2.4111: Utilize energy-efficient belts and other improved mechanisms $799 $1,648 $739
10,289
kWh
$60
-
kW-mo/yr
- - -
13 2.4231: Reduce the pressure of compressed air to the minimum required $768 $176 $708
9,861
kWh
$60
-
kW-mo/yr
- - -
14 2.1221: Replace obsolete burners with more efficient ones $314 $1,322 - - $314
-
MMBtu
- -
TOTAL RECOMMENDED $88,350 $113,952 $86,027
1,162,882
kWh
$7,646
-
kW-mo/yr
$370
-
MMBtu
$(-5,660.0) $(-33.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings