ITAC Assessment: SF0493
ITAC logo
ITAC Assessment: SF0493
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Vehicle Suspension Products
NAICS 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 86,000
ft2
Annual Production 43,000
pieces
Production Hrs. Annual 5,520
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,016 1,338,938
kWh
Electricity Demand $92,623 3,528
kW-mo/yr
Natural Gas $25,087 2,632
MMBtu
TOTAL YEARLY COSTS $261,726
RECOMMENDED SAVINGS* $158,803 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,035

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $81,971 - $79,052
734,954
kWh
- $2,919
-
MMBtu
- -
02 2.7442: Keep doors and windows shut when not on use $2,064 $1,350 - - $2,064
-
MMBtu
- -
03 2.7135: Install occupancy sensors $1,216 $1,134 $819
7,613
kWh
$397
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,058 $8,198 $5,045
46,903
kWh
$3,324
-
kW-mo/yr
- $113 $(-424.0)
05 2.9114: Use solar heat to make electricty $65,494 $424,736 $40,129
373,088
kWh
$25,365
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $158,803 $435,418 $125,045
1,162,558
kWh
$29,086
-
kW-mo/yr
$4,983
-
MMBtu
$113 $(-424.0)
TOTAL IMPLEMENTED $84,035 $1,350 $79,052
734,954
kWh
- $4,983
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs