ITAC Assessment: LE0573
ITAC logo
ITAC Assessment: LE0573
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 26
Plant Area 435,600
ft2
Annual Production 4,000,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $456,328 7,480,800
kWh
Electricity Demand $34,004 13,350
kW-mo/yr
Electricity Fees $3,939 -
Other Gas $1 63,329
MMBtu
Waste Disposal Costs
Water Usage $63,164 13,874
Tgal
TOTAL YEARLY COSTS $557,436
RECOMMENDED SAVINGS* $559,756 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,259 $4,198 $4,177
68,480
kWh
$82
-
kW-mo/yr
-
02 4.652: Replace existing equipment with more suitable substitutes $8,341 $20,400 $7,887
129,293
kWh
$454
-
kW-mo/yr
-
03 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $361,764 $1,321,539 $342,119
5,608,512
kWh
$19,645
-
kW-mo/yr
-
04 2.7232: Replace existing hvac unit with high efficiency model $1,318 $5,952 $1,259
20,634
kWh
$59
-
kW-mo/yr
-
05 4.652: Replace existing equipment with more suitable substitutes $184,074 $995,727 $79,508
1,303,411
kWh
$4,566
-
kW-mo/yr
$100,000
TOTAL RECOMMENDED $559,756 $2,347,816 $434,950
7,130,330
kWh
$24,806
-
kW-mo/yr
$100,000
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs