Assessment Year | 2024 |
---|---|
Principal Product | Wastewater Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $10 M to 50M |
# of Employees | 26 |
Plant Area |
435,600
ft2
|
Annual Production | 4,000,000
Tgal
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $456,328 | 7,480,800 |
kWh
|
$0.061 | |
Electricity Demand | $34,004 | 13,350 |
kW-mo/yr
|
$2.55 | |
Electricity Fees | $3,939 | - |
|
- | |
Other Gas | $1 | 63,329 |
MMBtu
|
$0.000 | |
Waste Disposal Costs | |||||
Water Usage | $63,164 | 13,874 |
Tgal
|
$4.55 | |
TOTAL YEARLY COSTS | $557,436 | ||||
RECOMMENDED SAVINGS* | $559,756 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,259 | $4,198 |
$4,177
68,480
kWh
|
$82
-
kW-mo/yr
|
- | |
02 | 4.652: Replace existing equipment with more suitable substitutes | $8,341 | $20,400 |
$7,887
129,293
kWh
|
$454
-
kW-mo/yr
|
- | |
03 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $361,764 | $1,321,539 |
$342,119
5,608,512
kWh
|
$19,645
-
kW-mo/yr
|
- | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $1,318 | $5,952 |
$1,259
20,634
kWh
|
$59
-
kW-mo/yr
|
- | |
05 | 4.652: Replace existing equipment with more suitable substitutes | $184,074 | $995,727 |
$79,508
1,303,411
kWh
|
$4,566
-
kW-mo/yr
|
$100,000 | |
TOTAL RECOMMENDED | $559,756 | $2,347,816 |
$434,950
7,130,330
kWh
|
$24,806
-
kW-mo/yr
|
$100,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs