ITAC Assessment: OR0124
ITAC logo
ITAC Assessment: OR0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BROCHURES & CATALOGS
NAICS
n/a
SIC 2741: Miscellaneous Publishing
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 1,600,000
lb
Production Hrs. Annual 7,296
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,698 1,441,090
kWh
Natural Gas $5,596 1,096
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $3,845 - $529
28,429
kWh
$3,316
-
MMBtu
-
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $678 - $559
17,292
kWh
- $119
03 2.7142: Utilize higher efficiency lamps and/or ballasts $697 - $812
26,964
kWh
- $(-115.0)
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $365 - $425
12,309
kWh
- $(-60.0)
05 2.3212: Optimize plant power factor $2,186 $3,000 $2,186
-
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $47 $70 $47
879
kWh
- -
07 2.4133: Use most efficient type of electric motors $47 $70 $47
1,465
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,099 - $955
22,567
kWh
- $1,144
TOTAL RECOMMENDED $9,964 $3,140 $5,560
109,905
kWh
$3,316
-
MMBtu
$1,088
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs