Assessment Year | 1991 |
---|---|
Principal Product | BROCHURES & CATALOGS |
NAICS |
n/a
|
SIC | 2741: Miscellaneous Publishing |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
n/a
|
Annual Production | 1,600,000
lb
|
Production Hrs. Annual | 7,296
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,698 | 1,441,090 |
kWh
|
$0.034 |
Natural Gas | $5,596 | 1,096 |
MMBtu
|
$5.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,964 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $3,845 | - |
$529
28,429
kWh
|
$3,316
-
MMBtu
|
- | |
02 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $678 | - |
$559
17,292
kWh
|
- | $119 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $697 | - |
$812
26,964
kWh
|
- | $(-115.0) | |
04 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $365 | - |
$425
12,309
kWh
|
- | $(-60.0) | |
05 | 2.3212: Optimize plant power factor | $2,186 | $3,000 |
$2,186
-
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $47 | $70 |
$47
879
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $47 | $70 |
$47
1,465
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,099 | - |
$955
22,567
kWh
|
- | $1,144 | |
TOTAL RECOMMENDED | $9,964 | $3,140 |
$5,560
109,905
kWh
|
$3,316
-
MMBtu
|
$1,088 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs