ITAC Assessment: LE0583
ITAC logo
ITAC Assessment: LE0583
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product paper products
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 204
Plant Area 500,000
ft2
Annual Production 65,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,525,657 56,969,343
kWh
Electricity Demand $483,388 78,050
kW-mo/yr
Electricity Fees $1,079,245 -
Natural Gas $3,776,541 837,218
MMBtu
TOTAL YEARLY COSTS $8,864,831
RECOMMENDED SAVINGS* $2,060,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $9,486 - $8,341
134,534
kWh
$1,145
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $23,430 $2,300 $20,604
332,337
kWh
$2,826
-
kW-mo/yr
-
03 2.2449: Recover heat from exhausted steam, hot air or hot water $344,366 $63,000 $(-140,841.0)
(-2,271,629)
kWh
$(-1,604.0)
-
kW-mo/yr
$486,811
-
MMBtu
04 2.4323: Use optimum size and capacity equipment $19,014 $7,000 $19,014
306,685
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,716 $10,250 $24,373
393,120
kWh
$3,343
-
kW-mo/yr
-
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,627,510 $8,755,000 $3,385,200
54,600,000
kWh
$482,820
-
kW-mo/yr
$(-2,240,510.0)
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,189 $49,500 $8,081
130,341
kWh
$1,108
-
kW-mo/yr
-
TOTAL RECOMMENDED $2,060,711 $8,887,050 $3,324,772
53,625,388
kWh
$489,638
-
kW-mo/yr
$(-1,753,699.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs