ITAC Assessment: UD0830
ITAC logo
ITAC Assessment: UD0830
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product grey iron castings
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 108,000
ft2
Annual Production 22,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $694,710 15,361,920
kWh
Electricity Demand $358,516 6,659
kW-mo/yr
Natural Gas $201,308 18,037
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $97,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,924

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $24,816 $98,085 $2,653
57,850
kWh
- - $22,163
02 2.7142: Utilize higher efficiency lamps and/or ballasts $41,356 $105,300 $26,912
586,310
kWh
$13,474
-
kW-mo/yr
$970 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,133 $2,116 $3,008
130,880
kWh
$6,007
-
kW-mo/yr
$118 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,359 $2,998 $1,779
38,749
kWh
$170
-
kW-mo/yr
$410 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,874 $25 $1,791
32,028
kWh
$1,083
-
kW-mo/yr
- -
06 2.4154: Avoid rewinding motors more than twice $2,206 $4,754 $1,399
30,485
kWh
$807
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,541 $500 $11,865
258,489
kWh
$5,076
-
kW-mo/yr
$(-2,400.0) -
08 2.4239: Eliminate or reduce compressed air usage $355 $1,275 $355
7,291
kWh
- - -
TOTAL RECOMMENDED $97,640 $215,053 $49,762
1,142,082
kWh
$26,617
-
kW-mo/yr
$(-902.0) $22,163
TOTAL IMPLEMENTED $55,924 $113,470 $33,465
786,994
kWh
$21,371
-
kW-mo/yr
$1,088 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs